The Paperwork, Handled
PERMITS AND ENGINEERING IN HOUSTON
Yes, taking out a load bearing wall is permitted work. It falls under a City of Houston residential remodel permit, not a repair permit, because you are changing the floor plan of the house.
Here is what the city asks for: the existing floor plan with wall measurements, the proposed plan, an existing ceiling framing plan to verify which walls are bearing, and wall section details. For a load bearing demolition, Houston also wants the direction of the ceiling joists and where the header and beam will land.
Now, about the engineer. You will see contractors say Houston requires a stamped engineer's drawing for any load bearing work. That is not quite what the city says. Houston's own residential permitting guidance says demolition of a load bearing wall may also require an engineer seal. It is a case by case call. On our jobs we bring in a licensed Texas structural engineer either way, because the beam has to be sized for your actual span and your actual load, and because a sealed drawing moves plan review along.
The code behind all of this is current and specific. Houston has been on the 2021 International Residential Code with Houston amendments since January 1, 2024. The city's design criteria classify Houston soil as expansive, put the city in seismic design category A and wind exposure category B, and pull the design wind speed for each address from the ASCE 7-22 hazard tool. In plain terms: gravity load is usually what governs an interior wall removal, but whether that wall is also part of a braced wall line is a separate question, and it is exactly why an engineer looks at it instead of a contractor eyeballing it.
One thing worth knowing. The City of Houston does not license general contractors. Anyone can call themselves one here. Trade contractors are licensed, electricians and plumbers and AC, but the person running your job is not required to hold anything. That is why it is worth asking who is pulling your permit and who is sealing your drawings.
Two more things Houston will ask about. First, floodplain: the city wants to know whether the property sits in the 100 year floodplain, the floodway, or a conveyance zone. If you are in the floodplain and the improvement is worth 50 percent or more of the structure's market value, the whole structure has to be brought into compliance, not just the part you are changing. A wall removal on its own rarely crosses that line, but a wall removal wrapped into a full renovation of a modest value house can. Second, deed restrictions: Houston has no zoning, but deed restrictions and HOA rules bind independently of the permit, so they are worth checking before demo day.
Plan review runs one to fifteen business days, and the permit is valid for six months. We handle all of it. The plans, the permit, the inspections. You do not call the city.
Based on the City of Houston Residential Remodel Permit requirements, the Houston Public Works Residential Permitting 101 guidance, and the City of Houston Building Code Design Criteria (form CE-1110). Reviewed August 2026.